This project involved the phased design development, management and construction of an ADPI design. The scheme also involved the modification of 1,576 sq.m. of the existing Terminal One building and associated infrastructure. The operational requirement of the terminal was maintained throughout construction.
Year: 2009
Area: 16,964 sqft
Construction Cost: $38M USD









